Construction Programme and Progress Tracker for Excel | UK Building Schedule Spreadsheet

Preis:€ 8,88

Wird geladen...
Inkl. USt.

Designt von Lewis

LJLDigital ·

Wokingham, Vereinigtes Königreich

Beinhaltet Etsys Einkaufsschutz

Du kannst nur dann ein Angebot machen, wenn du einen einzelnen Artikel kaufst.

Highlights

  • Designt von LJLDigital
  • Party-Deko für Zusammenkünfte und Feste
  • Digitaler Download
  • Digitale(r) Dateityp(en): 1 Datei
Leider konnten wir diesen Artikel nicht auf Deutsch übersetzen.

Plan a clear construction programme and track progress without complicated project-management software. Designed for UK builders, contractors, small developers and property renovators managing one project with up to 50 tasks.

WHAT YOU GET
One Excel .xlsx workbook with three sheets: Dashboard, Programme and Guide. Fictional sample data and step-by-step instructions are included.

FEATURES
• Up to 50 construction tasks
• Project start and review dates
• Project-start, after-previous and manual start rules
• Monday-to-Friday working-day calculations
• Planned start and finish dates
• Progress percentages and actual completion dates
• Complete, in-progress, not-started and overdue statuses
• Overall progress and forecast completion date
• Dashboard programme snapshot
• Trades, phases and notes

SIMPLE WORKFLOW
Set the project dates, replace the sample programme, choose a start rule and duration for each task, then update progress as work continues. Tasks set to After previous begin on the next working day after the row above finishes.

FILE & COMPATIBILITY
Digital download only. No physical product. One Excel .xlsx workbook; no macros. The workbook has been checked in Excel. It uses standard formulas that may be imported into Google Sheets, but native Google Sheets compatibility has not been independently verified. Check WORKDAY formulas, dates, validation and conditional formatting after import. Spreadsheet software is not included.

PLEASE NOTE
Working days are Monday to Friday. UK public holidays, shutdowns and non-standard work patterns are not built in. Reorder rows carefully because After previous follows the physical row above. The forecast does not automatically react to late actual completion; update programme inputs to reforecast.

V1 LIMITS
No resource levelling, critical-path calculation, public-holiday calendar, costs, contracts, document storage or multi-project portfolio. Replace all fictional sample data before live use.

Created with AI assistance and refined through formula, boundary and sample-data testing. Contact LJLDigital through Etsy for download help.

Sofort-Download

Sobald die Zahlung bestätigt wurde, stehen deine Dateien zum Download bereit.  Hier erfährst du wie.

Sofort-Download-Artikel können nicht zurückgegeben, umgetauscht oder storniert werden. Bitte kontaktiere den Shop, wenn du Probleme mit deiner Bestellung hast.

Etsys Einkaufsschutz
Kaufe beruhigt auf Etsy ein, denn wenn bei einer Bestellung etwas schief geht, stehen wir dir für alle berechtigten Einkäufe zur Seite – siehe Programmbedingungen

Käufer:innen mit ähnlichem Geschmack waren hiervon begeistert

Mehr anzeigen
Mehr anzeigen
Eingestellt am 29. Sept. 2026