Focus Session Timer App for Deep Work, Pomodoro Tracker with Live Charts and Report, ADHD Productivity Planner, Offline Browser App

Prijs:EUR 7.48

Laden
Inclusief btw

Je kunt alleen een bod doen als je een enkel item koopt

Hoogtepunten

  • Decoratie voor bijeenkomsten en feesten
  • Digitale download
  • Downloadbestand(en): 1 ZIP
Het lukte ons niet om deze listing te vertalen naar het Nederlands.

A structured hour, on your own.

Alongside gives a solo work session the shape a co-working hour has. You name the task, work the block, it checks in on you, it asks how it went — and it keeps every session that finished. One HTML file. Open it by double-clicking. No account, no subscription, works offline.

━━━━━━━━━━━━━━━━━━━━
THE LOOP
━━━━━━━━━━━━━━━━━━━━

1 · DECLARE — Name one thing, plainly. Optionally why it matters. Pick 15, 25, 45, 60 or 90 minutes and your energy right now. It will not start without a task, which is the one rule the app enforces.

2 · WORK THE BLOCK — A ring that empties as the block runs, a clock that keeps counting past zero, and live counters for check-ins, parked thoughts and minutes worked. Space pauses; paused time is subtracted, not counted.

3 · CHECK IN — Every ten minutes, or whenever you press C. Flowing, wobbling or stuck, plus a line if you have one. Three seconds, then back to work. Set the interval, or turn it off.

4 · REPORT BACK — Done, partly, or didn't start. Focus out of five. Energy now. One line on what helped or broke it. That is the session on the record.

PARK A THOUGHT — Press P mid-block and whatever just pulled at you waits in the parking lot until the block ends. The timer never stops.

━━━━━━━━━━━━━━━━━━━━
THE REPORT THAT WRITES ITSELF
━━━━━━━━━━━━━━━━━━━━

Six numbers, each compared against the previous period of the same length, each with its own sparkline: blocks finished, focus hours, completion rate, average focus, day streak, average block length.

Then it reads your own history back to you. Eleven tests run; the six with most to say are shown:

• Your best hour of day, by how often blocks started then actually finish
• Which block lengths you finish, and which ones you don't
• Whether checking in changes the outcome — measured on your own sessions
• What a block costs or gives you in energy
• Whether writing down "why it matters" changed anything
• Where the most minutes went, your streak, and how this period compares to the last

Every test has a minimum sample and stays quiet until it is met. Nothing here is guessed.

EIGHT LIVE CHARTS, all redrawing when you switch between 7 days, 30, 90 or all time:
• Focus time by day
• How blocks land — done, partly, didn't start
• Focus rating over time
• When your focus holds — a 7 × 24 weekday-and-hour heatmap
• Completion by planned block length
• Where the hours actually went, by task
• Energy in, energy out, by weekday
• What the check-ins found

━━━━━━━━━━━━━━━━━━━━
HISTORY
━━━━━━━━━━━━━━━━━━━━

Every finished block, grouped by day, searchable and filterable by outcome and tag. Open any row for the whole session: planned against actual, energy either side, your note, every check-in with its answer, and everything you parked.

━━━━━━━━━━━━━━━━━━━━
TEN THEMES
━━━━━━━━━━━━━━━━━━━━

Meridian, Aurora, Sandstone, Nocturne, Orchard, Cassette, Tidepool, Ember, Porcelain and Ultraviolet. Five light, five dark, each a full palette rather than a tint — the charts re-colour with the page and the dark ones are designed, not inverted. Porcelain is there if you want the lowest-stimulation option. Press T to step through them; your choice is remembered.

━━━━━━━━━━━━━━━━━━━━
SOUND, GENERATED ON YOUR DEVICE
━━━━━━━━━━━━━━━━━━━━

Brown noise, rain or a low hum while a block runs, plus a soft chime on check-ins and endings. Made with the Web Audio API on your own machine — no audio files, works offline, nothing to download.

━━━━━━━━━━━━━━━━━━━━
KEYBOARD
━━━━━━━━━━━━━━━━━━━━

Space start/pause · N new block · C check in · P park a thought · E end and report · T next theme · 1–4 switch tabs · ? the full list. Nothing needs the mouse.

━━━━━━━━━━━━━━━━━━━━
WHAT YOU GET
━━━━━━━━━━━━━━━━━━━━

One ZIP containing three files:
✓ Alongside.html — the whole app, one self-contained file
✓ START HERE.html — a two-minute quick start
✓ Alongside — Full Guide.html — every page, number and chart explained

━━━━━━━━━━━━━━━━━━━━
HOW IT WORKS
━━━━━━━━━━━━━━━━━━━━

1. Buy and download instantly
2. Unzip, keeping the three files together
3. Double-click Alongside.html — it opens in your browser
4. Bookmark the tab, or on iPad/Android use Share → Add to Home Screen

Works in Chrome, Safari, Firefox and Edge, on Windows, Mac, Linux, Chromebook, iPad and Android. Nothing to install, no build step, no internet needed after the download.

━━━━━━━━━━━━━━━━━━━━
YOUR DATA
━━━━━━━━━━━━━━━━━━━━

There is no account and no server. Your sessions live in your own browser's storage on your own device, and nothing is uploaded or tracked. One button copies everything out as JSON for backup, another pastes it back, and a third deletes all of it.

Please note: because it is stored in your browser, clearing your browser's site data will delete your history. Take a backup first. This is explained in the guide.

The app opens with 21 days of example blocks so the charts have something to say from the first minute. One click clears them.

━━━━━━━━━━━━━━━━━━━━
PLEASE NOTE
━━━━━━━━━━━━━━━━━━━━

• This is a digital download. No physical item will be shipped.
• Because digital files cannot be returned, all sales are final — but if anything is wrong with your download, message me and I will sort it.
• For personal use only. Please do not resell, redistribute or share the file.
• Alongside is an organisation and planning tool. It is not medical, psychological or therapeutic advice, it does not diagnose anything, and it is no substitute for professional care. The focus and energy figures are your own self-reports, not measurements.
• It is a single-player tool: it gives a solo hour the shape a co-working hour has, which is not the same as having another person there.

AI DISCLOSURE: this app and its listing images were built with AI assistance, then designed, tested and reviewed by a human. The screenshots are photographs of the real file, running, with example data.

Tomorrow morning you can open another blank to-do list, or open something that asks you one question and then gets out of the way.

Directe download

Je bestanden worden beschikbaar voor download zodra je betaling bevestigd is.  Hier vertellen we je hoe dat moet.

Directe downloads kunnen niet geretourneerd, geruild of geannuleerd worden. Neem contact met de verkoper op als er problemen met jouw bestelling zijn.

Etsy's Aankoopbescherming
Shop met vertrouwen op Etsy wetende dat als er iets misgaat met een bestelling, dan helpen we je. Lees hier de voorwaarden.

Geef dit item als eerste een recensie

Nog geen recensies. Kijk wat klanten zeggen over andere items van deze shop.

Misschien vind je dit ook leuk:

Populair bij shoppers met een vergelijkbare stijl

Toon meer
Toon meer
Geplaatst op 19 sep. 2026