Price:€74,08

Loading
VAT included (where applicable), plus shipping

Highland Cow Front Door Sign gift. Year-Round Long Hair Scottish Cow Wreath. 3D Wood Image. Housewarming Wedding Gift. Moo! AB01a

ShopCottonwood  

You can only make an offer when buying a single item

Star Seller. This seller consistently earned 5-star reviews, shipped on time, and replied quickly to any messages they received.

Highlights

  • Materials: Baltic Birch, wood

  • Width: 18 inches
    Height: 18 inches
    Depth: 1 inches

FREE UPGRADES to our Forever Acrylic(tm) on most Wood Creations. No Extra Charge!

Acrylic Colors: Gold, Black, White, + Special Order Custom Colors (volume)

Message us for more info on our creations in Acrylic, Metal, Wood, Resin, UV, Paper, and More.
Event Planner? Special Services Available

Have a little fun with our distinctive Highland Cow Door sign with a real bell on the bow. Moo!

Make your door unique with one of our custom Front Door Sign creations direct from our studio in Chattanooga TN to you!

Our Custom Front Door Signs are realAcryliclaser cut for perfection and burlap printed hand rolled ribbon. These add a distinctive "you" look to your home.

18 inch round antique white back with the highland cow oak stained. Crisp cut vinyl "Welcome" text letters, burlap hanger, PLUS clear coat for long lasting protection.

Hand tied bow with burlap and seasonal ribbon. Ribbon colors may vary somewhat. Burlap loop holder. Each one we make is unique for you and beautiful.

Not intended to be outside in direct sunlight. Should be placed on covered porch or behind glass door.

EachAcrylicsign will vary slightly from our pictures. Our creations are made from realAcrylicso you may seeAcrylicknots, crevices, and other imperfections. This is what adds character to every piece of Acrylic - makes your sign unique. Also please note that although the same stain/paint is used on the sign, different woods are going to soak/stain differently so colors may be slightly different than pictured.

Pick your options, place your order, and you are just a few days from adding this unique art to your home.

Looking forward to making one for you soon!

Made in beautiful Tennessee! Let us make something special for you today!

Check out more from our Wedding Collection of gifts:
https://www.etsy.com/shop/shopcottonwood/?etsrc=sdt&dd_referrer=§ion_id§ion_id=37341989

Visit our Shop for more of our creations. 

https://shopcottonwood.etsy.com


***SHIPPING / ORDER INFO***


We're fast and ship in just days -- other shops can take up to 2 weeks to ship. Our studio is in Chattanooga TN so shipping doesn't come from another country.



The included “Free Shipping” is US Mail First Class which can take from 2 to 7 days for delivery in the U.S. The further you are from our home in Chattanooga TN the longer it will take to reach you.



We recommend ordering at least 10 business days (M-F) before your latest required delivery date. This allows for best options for shipping without Express or Rush Fees.



***Select the correct shipping as you check out***


If you are ordering within 10 days of your latest required delivery date, we strongly recommend that you upgrade shipping to Priority, Express, or Overnight shipping service. For precise costs for Overnight, message us with your address.



Note that Etsy shipping times are sometimes not reliable. Priority Shipping Service is 2 to 3 days to most parts of the country. Express Shipping Service is 1 to 2 days to most parts of the country. Overnight Shipping Service 1 day to most parts of the country. AFTER WE CREATE YOUR ORDER. Message us for better delivery estimates and whether we can accommodate any Rush or Emergency orders.



Confirm your shipping address and shipping level is correct since we will ship your order as submitted. Correct shipping choice is your responsibility.


Need your order extra fast? We have options including Fast Track Rush, Emergency Service, and Overnight Early AM delivery for additional fees. Message us with questions.



***CAREFULLY PROOF YOUR ORDER***


We process orders very quickly and there is often no time to adjust an order after it has been placed so that we can meet all customer deadlines.
We reserve the right to not accept changes to an order after it is placed.

Additional order(s) can be placed to be shipped with original order if time allows.



Message us if you having ANY special requests or questions, we are here to help!

Loading
  • Ships out within 1–5 business days
  • Returns & exchanges not accepted
  • Ships from: United States

Sorry, this item doesn’t ship to Finland. Contact the shop to find out about available shipping options.

There was a problem calculating your shipping. Please try again.

Etsy Purchase Protection
Shop confidently on Etsy knowing if something goes wrong with an order, we've got your back for all eligible purchases — see program terms

Etsy invests in climate solutions like electric trucks and carbon offsets for every delivery. See how
Etsy invests in climate solutions like electric trucks and carbon offsets for every delivery. See how

Captcha failed to load. Try using a different browser or disabling ad blockers.

Reviews for this item (11)

4.8 /5

We calculate this number using an average of all ratings from the past twelve months.

5.0 Item quality
4.5 Shipping
5.0 Customer service
100% Buyers recommend
Loading
Buyer highlights, summarized by AI
Love it Fast shipping Responsive seller As described Would recommend Very well made Adorable
Filter by category
5 out of 5 stars 5 This item

Jenny Mar 12, 2026

I absolutely love my Highland cow door sign. It is very well-made and fast shipping as well.

Jenny Mar 12, 2026

5 out of 5 stars 5 This item

Etsy buyer Sep 21, 2025

Adorable! My mom loved it!

Etsy buyer Sep 21, 2025

Response from Katie and Ellie

Thank you so much for taking time to leave a review. We love hearing from our customers and it helps our small business grow. ~Ellie

4 out of 5 stars 4 This item

Siedah Aug 23, 2025

An absolute hit! I was disappointed in shipping speed as many reviews report it was very quick. Everything else was great.

Siedah Aug 23, 2025

Response from Katie and Ellie

Thank you for the kind words. We always ship as quickly as we can. Your order was shipped and delivered within the Etsy posted expected delivery window. Ellie - Team Cottonwood Chattanooga Studio

5 out of 5 stars 5 This item

Renee May 23, 2025

LOVE it! Very fast response and customized perfect!

Renee May 23, 2025

ShopCottonwood
ShopCottonwood ·

Tennessee, United States

We calculate this number using an average of all ratings from the past twelve months. 5.0
·
18.4k sales
·
4 years on Etsy
Ellie Vince Joel Mr. Klaus
9 shop members

Typically responds within a few hours

Typically responds within a few hours

Smooth shipping Has a history of shipping on time with tracking.

Speedy replies Has a history of replying to messages quickly.

Rave reviews Average review rating is 4.8 or higher.

Shoppers with similar taste loved these

Show more
Show more
Assortment of wedding items that are available on EtsyAssortment of wedding items that are available on EtsyAssortment of wedding items that are available on Etsy

Get personalized picks for your big day!

Wedding date
Listed on Feb 15, 2026