Informar sobre este artículo a Etsy

Bill of Materials Template | Single-Level Parts List with Extended Cost, Make or Buy and Total Cost, Excel & Google Sheets, Printable Form

Precio:MX$116.09

Cargando
IVA incluido
OperationalPlaybook  
5 de 5 estrellas

5,0 de 5

2 valoraciones

5 estrellas
100 %
4 estrellas
0 %
3 estrellas
0 %
2 estrellas
0 %
1 estrella
0 %

Solo puedes hacer una oferta por compras de un único artículo

Vendedor estrella. Este vendedor recibió sistemáticamente reseñas de 5 estrellas, envió los pedidos de manera puntual y respondió rápidamente a los mensajes que recibió.

Puntos destacables

  • Descarga digital
  • Tipos de archivos digitales: 1 ZIP
Lo sentimos, no hemos podido traducir este anuncio al español.

This is one bill of materials template.

WHAT YOU DOWNLOAD (one ZIP: Bill_of_Materials_Etsy_Bundle_v1.zip, 4 files)
* Bill_of_Materials_Template_v1.xlsx - the editable Excel workbook, 3 tabs. BOM: a header block (Product / Assembly, Part No., Revision, Department, Prepared By, Date and Total Cost) above a single-level parts grid with one row per part, 11 columns from left to right (Item No., Part No., Description, Material / Spec, Qty per Unit, UoM, Make / Buy, Supplier, Unit Cost, Extended Cost and Row Check), 8 example rows in gray italic text for a centrifugal pump assembly and room for 50 parts. You type the item number, part number, description, material or spec, quantity per unit, UoM, make or buy, supplier and unit cost; the two shaded columns calculate. Extended Cost is Qty per Unit times Unit Cost and stays blank until both are filled in. Total Cost, one cell in the header block, adds every Extended Cost. Row Check stays blank on an empty row; otherwise it names the first missing required field (Missing part no., Missing description, Missing qty, Missing UoM, Missing make or buy or Missing unit cost) in red, or reads Complete in green. Department (Production, Quality, Maintenance, Warehouse, EHS or Engineering) and Make / Buy (Make or Buy) take a value from their list, Date takes a date, and Qty per Unit and Unit Cost take a number and refuse a negative one; each of these refuses a wrong entry. UoM offers EA, Set, Pair, kg, m or L and warns on any other unit but lets you keep it. Supplier warns when a supplier is not on the Lists tab and lets you keep it. The grid header row carries filter buttons, and the header block, the grid header and the Item No. column stay frozen. Lists: your suppliers for the Supplier dropdown, room for 10, shipped with example suppliers (In house, Casting supplier, Bearing distributor, Seal supplier, Fastener distributor and Gasket supplier). Dashboard: the product or assembly and its revision at the top, a cost summary (line items on the BOM, total cost, make items, buy items, rows complete and rows to complete), make and buy cost, cost by supplier with a line for suppliers not on the list or left blank, and two charts (cost by supplier, and make and buy cost).
* Bill_of_Materials_Template_v1_GoogleSheets.xlsx - the same three tabs with a Google Sheets Setup tab first.
* Bill_of_Materials_Print_Ready_v1.pdf - a blank one-page printable bill of materials with a header block (Product / Assembly, Part No., Revision, Prepared By, Date and Total Cost), the same 11 columns and 12 rows to fill in by hand. US Letter landscape. No example entries, dropdowns, calculations or charts.
* Bill_of_Materials_Start_Here_v1.pdf - one-page setup guide, prints on US Letter.
Instant digital download. No physical item ships.

A parts list only helps when every row is complete and the cost adds up. When the bill of materials lives in an e-mail thread or in one engineer's notes, a part with no quantity or no unit cost is easy to miss until someone prices or builds the assembly. This template puts one assembly on one sheet: one row per part, with the part number, description, material or spec, quantity per unit, unit of measure, make or buy, supplier and unit cost. Extended Cost multiplies the quantity by the unit cost, Total Cost adds the rows, and Row Check names the first missing field on any row that is not complete. One Dashboard shows the cost summary, make and buy cost, and cost by supplier.

WHO IT IS FOR
Manufacturing engineers, production and operations managers, planners, shop owners and small manufacturers who build an assembled product and want each assembly's parts, quantities, make or buy split and costs on one sheet the whole team can read. It is a single-level parts list: one product or assembly per sheet, one row per part.

HOW IT WORKS
* Read the one-page Start Here, then open the Lists tab and replace the example suppliers with your own; the Supplier dropdown reads this list. Keep In house: it marks the parts you make.
* On the BOM tab, fill the header block: product or assembly, its part number, revision, department, prepared by and date.
* Overwrite the eight example rows with your own parts, or delete them: one row per part, with the item number, part number, description, material or spec, quantity per unit and UoM, make or buy, supplier and unit cost.
* Extended Cost and Total Cost calculate as you type. Row Check names the first missing field on each row, or reads Complete.
* Check the Dashboard before you share the BOM: the cost summary, make and buy cost and cost by supplier. Use the filter buttons to find a part, a supplier or the make items. Working on paper? Print the blank BOM sheet, then type the rows in.

MAKE IT YOURS
Add your company name to the page footer on each tab; the Start Here shows the Excel path. Suppliers change on the Lists tab: type over the examples and add more below, up to 10. The Department dropdown ships with Production, Quality, Maintenance, Warehouse, EHS and Engineering; to change it, select the Department cell in the header block, then Data, then Data Validation.

HOW THIS WAS MADE
Designed and built by us. We use AI tools to help draft text and, on some products, artwork. Every template, formula and page is reviewed, edited and tested before it ships.

LICENSE

Single-organization internal use is included.

You may customize the files for your organization's internal business use. Do not resell, redistribute, share, sublicense, or repackage the source files.

Consultants who want to use the materials across multiple client organizations should message the shop about licensing options.

PLEASE NOTE
This template is a structured starting point for your own bill of materials. It is a single-level parts list: one product or assembly per sheet, one row per part. The example entries are fictional. Nothing in it uses today's date, and it does not convert currency. It multiplies and adds the quantities and costs you type; it does not choose parts, suppliers or prices, number parts for you, or keep a record of past revisions. Your own team sets the parts, quantities, suppliers and costs and approves each revision. It has no macros, reminders or e-mail alerts, and it does not connect to other systems. It is an operational support tool, not professional advice.

Descarga inmediata

Los archivos estarán disponibles para descargar una vez que se confirme el pago.  Sigue estas instrucciones.

No se admiten cambios, devoluciones ni cancelaciones de los artículos de descarga inmediata. Ponte en contacto con el vendedor si tienes algún problema con tu pedido.

Protección de compras de Etsy
Compra con confianza en Etsy sabiendo que estamos a tu lado si surge un problema con un pedido que reúne los requisitos. Consulta las condiciones del programa

Valora este artículo antes que nadie

Aún no hay reseñas. Lee las opiniones de los clientes sobre otros artículos de esta tienda.

También podría interesarte

A los compradores con gustos similares les han gustado estos artículos

Mostrar más
Mostrar más
Fecha de publicación: 16 nov 2026