Informar sobre este artículo a Etsy

Hardware Finance Bundle Excel, 13 Week Cash and 36 Month Runway, Unit Economics BOM, SBIR STTR Budget Template

AhoraPrecio:MX$1,702.71

Precio original: MX$2,128.44

Cargando

-20 %

•

La oferta termina en 6 días

IVA incluido
Incluye protección de compras de Etsy

Solo puedes hacer una oferta por compras de un único artículo

Puntos destacables

  • Diseñado por BreezeCFO
  • Descarga digital
  • Tipos de archivos digitales: 1 ZIP
Lo sentimos, no hemos podido traducir este anuncio al español.

The Hardware Finance Bundle is $89. The three workbooks cost $117 if bought separately on Etsy ($59 + $29 + $29).

It is a set of Microsoft Excel workbooks for hardware founders and hard-tech, defense or deep-tech teams: one for unit cost and channel margins, one for cash and runway, and one for an SBIR or STTR proposal budget. A short Start Here guide comes with them. You do not have to use all three at once. The rate builder is there for when you are preparing a proposal.

WHAT'S IN THE BUNDLE
- Start Here guide (PDF): what each file is for, the order to use them, and how to work in the files
- Hardware Unit Economics and BOM Model (9 tabs; $29 if bought separately on Etsy)
- Hardware Runway Kit (15 tabs; $59 if bought separately on Etsy)
- SBIR/STTR Cost and Rate Builder (8 tabs; $29 if bought separately on Etsy)

Hardware Unit Economics and BOM Model
A unit economics workbook for a physical product. You list parts in a multi-level bill of materials, add assembly, test and contract manufacturer costs, then freight, duty and packaging, and get landed cost and fully loaded cost per unit at five volume tiers. It then prices that unit through direct-to-consumer, distributor and retail channels to show gross margin, contribution margin, and how many units it takes to pay back tooling and other one-time costs. The Summary tab is a one-page, print-ready view.

- Start Here: setup steps, tab map, color legend, key terms and model status
- Inputs: product and price, five volume tiers, freight, packaging, manufacturing, duty, how to spread one-time costs, and channel terms
- BOM: 40-row multi-level bill of materials with parent IDs for sub-assemblies, minimum order quantities, part yield and up to three supplier price breaks
- NRE and Tooling: 15 rows for molds, test fixtures, certification and other one-time costs
- Unit Cost: materials, labor, test, contract manufacturer markup, packaging, duty and freight, giving landed and fully loaded cost per unit at each tier, plus cash needed for a run
- Channels: price you receive, gross margin and contribution margin per unit by channel and blended, plus breakeven units
- Sensitivity: price steps by volume tier, showing contribution margin, gross margin and breakeven units
- Summary: cost per unit, channel economics and key numbers on one page
- Checks: 29 checks that roll up to one master check

Hardware Runway Kit
A weekly 13-week cash view and a 36-month monthly runway that reconcile to each other. They are driven by a payroll engine, a 60-row headcount plan, product and milestone revenue with supplier deposits and collection lags, capex, and a financing stack.

- Start Here: tab map, color legend and model status
- Inputs: start date, opening balances, covenant, scenario selector, payroll settings and tax caps
- Headcount Plan: 60-row roster with role, department, start and end month, pay, raise, bonus and hiring costs
- Revenue: product lines, contract milestones, COGS (cost of goods sold) method, deposits, lead time and collection days
- Opex: non-payroll costs by category, including one-time items
- Capex: equipment and tooling with deposit and balance timing
- Financing: equity, venture debt, equipment loan, a credit line against unpaid invoices (AR revolver), grants and customer prepayments
- Payroll: per-person wages, employer taxes with caps, benefits, bonus and contractors
- Engine: the monthly timeline and week-by-month ledger that the cash views run through
- 13-Week Cash: weekly receipts and disbursements, paydays, covenant headroom and the low point
- 36-Month Runway: monthly P&L view, cash flow, burn, runway and covenant flags
- Scenarios: Base, Downside and Upside, plus a runway sensitivity grid
- Board Cash Page: a one-screen summary with charts
- Lender Sequencing: financing order, lead times and start-by dates
- Checks: 32 checks that roll up to one master check

SBIR/STTR Cost and Rate Builder
A workbook for building an SBIR or STTR proposal budget from your own company numbers. You work out fringe, overhead and G&A rates from a 12-month company budget, list people and other costs by period, and roll them into a budget by year and by phase, with fee, total price, award-cap checks and work-share checks. The Proposal Summary tab is a one-page cost summary to use when you fill in your agency's budget forms.

- Start Here: tab map, color legend and key terms
- Inputs: company, program (SBIR or STTR), budget periods, award caps, fee and work-share minimums from your solicitation
- Direct Labor: 15-row roster with role, pay, hours in each period and yearly raises
- Other Direct Costs: 20 item rows for materials, equipment, travel, subcontractors, consultants and the research partner
- Indirect Rates: fringe, overhead and G&A cost pools from your company budget, the computed rates, and an override column for a provisional or negotiated rate
- Budget: each cost line by period and phase, with fee, total price, award-cap check and work share
- Proposal Summary: rates, budget, caps and work share on one page
- Checks: 31 checks that roll up to one master check

HOW THEY WORK TOGETHER
The workbooks are not linked. You carry the figures from one into the next.

1. Hardware Unit Economics and BOM Model — build your unit cost.
2. Hardware Runway Kit — carry the unit cost in, then set up cash, payroll, headcount and runway.
3. SBIR/STTR Cost and Rate Builder — use this when you are preparing an SBIR or STTR proposal.

SAMPLE FIGURES
Each workbook ships with invented sample figures for an invented company, so you can see how it works before you type your own numbers. The companies, products and all sample numbers are made up. Replace them with your own.

GOOD TO KNOW
- Built for Microsoft Excel. No macros, add-ins or external links.
- Open each workbook in Microsoft Excel. Save a copy first and keep the original clean.
- Type only in the yellow cells, then confirm each Checks tab shows TRUE.
- The unit-economics breakeven covers tooling and other one-time costs only. It does not include salaries, rent or other fixed costs, so your full breakeven is higher.
- Supplier prices, duty, freight and channel terms change often. Award caps, fee limits and work-share rules differ by agency. The sample values are examples; confirm your own figures with your suppliers, contract manufacturer and current solicitation.
- Format: Excel (.xlsx) workbooks plus a Start Here PDF.
- This is a digital download. Nothing is shipped.

Download all three workbooks and the Start Here guide for $89.

Created with the help of AI tools, then reviewed and edited by the seller.

Educational, not financial or legal advice. A planning template, not a substitute for your accountant, lawyer or lender.

Descarga inmediata

Los archivos estarán disponibles para descargar una vez que se confirme el pago.  Sigue estas instrucciones.

No se admiten cambios, devoluciones ni cancelaciones de los artículos de descarga inmediata. Ponte en contacto con el vendedor si tienes algún problema con tu pedido.

Protección de compras de Etsy
Compra con confianza en Etsy sabiendo que estamos a tu lado si surge un problema con un pedido que reúne los requisitos. Consulta las condiciones del programa

También podría interesarte

A los compradores con gustos similares les han gustado estos artículos

Mostrar más
Mostrar más
Fecha de publicación: 17 nov 2026