NowPrice:$38.82+
Original Price: $64.70+
40% off
Sale ends in 2:13:21
Traditional Star Patchwork Pattern Quilted Laundry Basket, Rustic Farmhouse Gift, Quilter Birthday Gift, Fabric Storage Bin
Returns & exchanges accepted
You can only make an offer when buying a single item
Highlights
🧺 Add timeless Americana charm to your home with our Traditional Star Quilt Pattern Laundry Basket! Inspired by classic patchwork designs, this quilted fabric bin offers a cozy farmhouse aesthetic. Perfect for storing blankets or clothes, it makes a high-quality gift for quilters and fans of vintage style.
✨ PRODUCT DETAILS
• 100% polyester outer fabric
• Soft cotton-padded interior
• Durable quilted fabric construction
• Lightweight, flexible, and foldable
• Two strong and comfortable white fabric handles
• High-quality sublimation printing
• Printed artwork covers the outer body of the basket
• Made to order
📏 AVAILABLE SIZES
• 14 × 18 inches
• 16 × 22 inches
• 20 × 28 inches
Please review the size information carefully before placing your order.
🎨 PRINT & COLOR INFORMATION
• The white fabric handles are not customizable.
• Printed colors may vary slightly due to different monitor and screen settings.
• Small variations in print placement, stitching, shape, or dimensions may occur because each item is individually made.
• The basket may arrive folded for shipping. Simply reshape it by hand and allow it some time to return to its natural form.
🧼 CARE INSTRUCTIONS
• Spot clean or gently hand wash when needed
• Use cold water and mild detergent
• Do not bleach
• Air dry recommended
• Avoid ironing directly over the printed design
⏳ PROCESSING & SHIPPING TIME
• Production time: 4–10 business days
• Shipping time: 2–5 business days after production
• Delivery estimates may vary during holidays and peak seasons.
If you need your order by a specific date, please contact us before ordering and we'll do our best to assist.
⚠️ PLEASE NOTE
• Colors may vary slightly due to monitor settings, lighting conditions, and printer calibration.
• The basket is designed to fold for shipping. Minor creases from packaging will naturally relax after a short period of use.
• White carrying handles are not printable and will remain white on every design.
• Please double-check your selected size, personalization details, spelling, and delivery address before completing your purchase.
Production partners
Mirevale makes this item with help from-
Order today to get by Oct 2-13
Your order should arrive by this date if you buy today. To calculate an estimated delivery date you can count on, we look at things like the carrier's latest transit times, the seller's processing time and shipping history, and where the order is shipping to and from.
-
Returns & exchanges accepted within 14 days
Buyers are responsible for return shipping costs. If the item is not returned in its original condition, the buyer is responsible for any loss in value.
-
Cost to ship: $5.99
-
Ships from: Houston, TX
There was a problem calculating your shipping. Please try again.
Etsy Purchase Protection
Shop confidently on Etsy knowing if something goes wrong with an order, we've got your back for all eligible purchases —
see program terms
Be the first to review this item
More from this shop
Visit shop-
Personalized Safari Nursery Quilt Laundry Basket, Jungle Animal Baby Hamper, Custom Name Lion Giraffe Bin, Fabric Toddler Toy Organizer Bag
Sale Price $38.82
Original Price $64.70
-
Farmhouse Chicken Quilt Laundry Basket, Whimsical Hen Theme Laundry Hamper, Rustic Country Fabric Storage Bin, Patterned Bird Toy Bag
Sale Price $38.82
Original Price $64.70
-
Whimsical Firefly Night Meadow Quilted Laundry Basket, Personalized Nursery Storage Bin, Custom Nature Gift, Hamper, Organizer, Home Decor
Sale Price $6.59
Original Price $10.99
-
Folk Art Chicken Quilt Laundry Basket, Country Farmhouse Hen Hamper, Rustic Cream Fabric Storage Bin, Red Gingham Trim Toy Bag
Sale Price $38.82
Original Price $64.70
-
Quilted Fabric Storage Bin, Chevron Decor, Handmade Basket
$12.90
-
Wildflower Quilted Laundry Basket, Butterfly Floral Hamper, Cottagecore Fabric Laundry Bin, Laundry Room Storage Decor
Sale Price $27.41
Original Price $36.55
-
Peg Basket Storage Pod- Quilted Bin, Quilt Storage Bag, Scrap Fabric Bin, Bathroom Bin, Eco Friendly Gifts, Fabric Storage, Recycled Decor
$45.00
-
Peg Basket Storage Pod- Quilted Bin, Quilt Storage Bag, Scrap Fabric Bin, Bathroom Bin, Eco Friendly Gifts, Fabric Storage, Recycled Decor
$45.00
-
Peg Basket Storage Pod- Quilted Bin, Quilt Storage Bag, Scrap Fabric Bin, Bathroom Bin, Eco Friendly Gifts, Fabric Storage, Recycled Decor
$45.00
-
Peg Basket Storage Pod- Quilted Bin, Quilt Storage Bag, Scrap Fabric Bin, Bathroom Bin, Eco Friendly Gifts, Fabric Storage, Recycled Decor
$45.00
-
Peg Basket Storage Pod- Quilted Bin, Quilt Storage Bag, Scrap Fabric Bin, Bathroom Bin, Eco Friendly Gifts, Fabric Storage, Recycled Decor
$45.00
-
Peg Basket Storage Pod- Quilted Bin, Quilt Storage Bag, Scrap Fabric Bin, Bathroom Bin, Eco Friendly Gifts, Fabric Storage, Recycled Decor
$45.00
-
Peg Basket Storage Pod- Quilted Bin, Quilt Storage Bag, Scrap Fabric Bin, Bathroom Bin, Eco Friendly Gifts, Fabric Storage, Recycled Decor
$45.00
-
Peg Basket Storage Pod- Quilted Bin, Quilt Storage Bag, Scrap Fabric Bin, Bathroom Bin, Eco Friendly Gifts, Fabric Storage, Recycled Decor
$45.00
-
South Dakota Quilt Basket with Handles - Quilted Bin, Quilt Storage Bag, Scrap Fabric Bin, Bathroom Bin, Eco Friendly Gifts, Fabric Storage
$28.00
-
Heart Patchwork Quilted Storage Basket – Fabric Bin for Sewing Room & Home
$29.95
Shoppers with similar taste loved these
-
Crochet Afghan Blanket,Patchwork Knitted sofa blanket, Granny Square Bedspread Throw, large crochet blanket, vintage blanket, retro blanket
Sale Price $157.50
Original Price $210.00
-
Handmade Granny Square Crochet Blanket: Patchwork Wool Bedspread Throw
Sale Price $45.00
Original Price $60.00
-
Crochet African Flower Granny Square Blanket, Multicolored Cotton Throw
$120.00
-
Crochet Roseanne Blanket, Crochet Throw, Granny Square Afghan, Black Boho Throw, Retro Cozy Blanket, Christmas Gift Idea, Gift for Her
Sale Price $45.98
Original Price $54.09
-
Handmade Granny Square Crochet Afghan: Wool Patchwork Bedspread
Sale Price $45.00
Original Price $60.00
-
Granny Square Crochet Afghan, Colorful Cotton Blend Throw
$190.00
-
Wholesale Lot Of Indian Vintage Kantha Quilt Handmade Throw Reversible Blanket Bedspread Cotton Fabric BOHEMIAN quilt
Sale Price $17.85
Original Price $59.50
-
Wholesale Vintage Indian Kantha Quilt: Handmade Reversible Cotton Throw Blanket - Bohemian Bedspread
Sale Price $14.98
Original Price $42.80
-
Wholesale Indian Kantha Quilt Lot: Vintage Handmade Reversible Throws
$78.65
-
Wholesale Lot Vintage Kantha Quilts: Indian Sari Throw Blanket, Twin Bedspread
Sale Price $42.90
Original Price $85.80
-
Wholesale Lot Of Indian Vintage Kantha Quilt Handmade Throw Reversible Blanket Bedspread Cotton Fabric BOHEMIAN quilt
Sale Price $14.98
Original Price $42.80
-
Teal Paisley Kantha Quilt | Hand-Stitched Indian Cotton Bedspread, Boho Throw Blanket
Sale Price $47.06
Original Price $58.83