Report this item to Etsy

Production Schedule Template | Weekly Production Planning Sheet with Plan vs Actual by Work Center, Excel & Google Sheets, Printable Form

Price:$4.99

Loading
OperationalPlaybook  
5 out of 5 stars

5.0 out of 5

2 ratings

5 stars
100%
4 stars
0%
3 stars
0%
2 stars
0%
1 star
0%

You can only make an offer when buying a single item

Star Seller. This seller consistently earned 5-star reviews, shipped on time, and replied quickly to any messages they received.

Highlights

  • Digital download
  • Digital file type(s): 1 ZIP

This is one weekly production schedule template.

WHAT YOU DOWNLOAD (one ZIP: Production_Schedule_Etsy_Bundle_v1.zip, 4 files)
* Production_Schedule_Template_v1.xlsx - the editable Excel workbook, 3 tabs. Schedule: a header block (Week Starting, Area / Line, Department and Prepared By) above a grid with one row per order or job, 14 columns from left to right (Order/Job No., Part, Work Center, Due Date, Mon, Tue, Wed, Thu, Fri, Sat, Week Plan, Actual Qty, Variance and Status), 7 example rows in gray italic text and room for 50 orders. You type the order or job number, the part, the work center, the due date and the planned quantity for each day from Monday to Saturday, then the actual quantity as work is reported; the two shaded columns calculate. Week Plan adds the six days and stays blank until a day has a quantity. Variance shows Actual Qty minus Week Plan and stays blank until both are filled in. Variance shows red when an order is behind plan and green when it is on or ahead of plan. Status is Open, Running or Done; Done shows green and Running amber. Week Starting and Due Date take a date, Department (Production, Quality, Maintenance, Warehouse, EHS or Engineering) and Status take a value from their list, and the six day columns and Actual Qty take a whole number; each refuses a wrong entry and shows a message. Work Center warns when a work center is not on the Lists tab and lets you keep it. The grid header row carries filter buttons, and the header block, the grid header and the Order/Job No. column stay frozen. Lists: your work centers for the Work Center dropdown, room for 10, shipped with example work centers (CNC mill 1, CNC lathe 2, Weld cell, Assembly line 1, Paint booth and Pack out). Dashboard: the week starting date and the area or line at the top, a week summary (orders on the schedule, week plan total, actual quantity total, variance total, orders behind plan and orders at or above plan), orders by status (Open, Running and Done), planned quantity by day from Monday to Saturday, plan and actual by work center with a line for work centers not on the list, and two charts (plan and actual by work center, and planned quantity by day). Nothing on the Dashboard needs typing.
* Production_Schedule_Template_v1_GoogleSheets.xlsx - the same three tabs with a Google Sheets Setup tab first.
* Production_Schedule_Print_Ready_v1.pdf - a blank one-page printable weekly schedule with the same header block, the same 14 columns and 12 rows to fill in by hand. US Letter landscape. No example entries, dropdowns, calculations or charts.
* Production_Schedule_Start_Here_v1.pdf - one-page setup guide, prints on US Letter.
Instant digital download. No physical item ships.

A weekly plan only helps when the whole team works from the same sheet and can see, order by order, where the week is slipping. When the plan lives on a whiteboard or in one planner's notebook, an order that is behind is easy to miss until the end of the week. This template puts the week on one grid: one row per order or job, the planned quantity for each day from Monday to Saturday, and the actual quantity beside it. Week Plan adds the days, Variance shows actual minus plan, and an order behind plan shows red. One Dashboard shows the week summary, orders by status, planned quantity by day, and plan and actual by work center.

WHO IT IS FOR
Production planners, production supervisors, operations managers, plant and shop managers and team leads who plan a week of orders or jobs across a set of work centers and want plan and actual side by side on one sheet the whole team can read.

HOW IT WORKS
* Read the one-page Start Here, then open the Lists tab and replace the example work centers with your own; the Work Center dropdown reads this list.
* On the Schedule tab, fill the header block: week starting date, area or line, department and prepared by.
* Overwrite the seven example rows with your own orders, or delete them: one row per order or job, with the part, the work center, the due date and the planned quantity for each day from Monday to Saturday.
* As work is reported, type the Actual Qty and set the Status to Running or Done. Week Plan and Variance calculate; Variance shows red when an order is behind plan.
* Check the Dashboard before you share the schedule: the week summary, orders by status, planned quantity by day, and plan and actual by work center. Use the filter buttons to find an order, a part or a work center. Working on paper? Print the blank schedule sheet, then type the rows in.

MAKE IT YOURS
Add your company name to the page footer on each tab; the Start Here shows the Excel path. Work centers change on the Lists tab: type over the examples and add more below, up to 10. The Department dropdown ships with Production, Quality, Maintenance, Warehouse, EHS and Engineering; to change it, select the Department cell in the header block, then Data, then Data Validation.

HOW THIS WAS MADE
Designed and built by us. We use AI tools to help draft text and, on some products, artwork. Every template, formula and page is reviewed, edited and tested before it ships.

LICENSE

Single-organization internal use is included.

You may customize the files for your organization's internal business use. Do not resell, redistribute, share, sublicense, or repackage the source files.

Consultants who want to use the materials across multiple client organizations should message the shop about licensing options.

PLEASE NOTE
This template is a structured starting point for planning your own week. The example entries are fictional. Nothing in it uses today's date, so the calculated columns change only when you change a row. It adds and compares the quantities you type; it does not check whether a work center can run them, set or move dates, or draw a timeline. Your own team sets the orders, quantities, due dates and work centers and decides when a status changes. It has no macros, reminders or e-mail alerts, and it does not connect to other systems. It is an operational support tool, not professional advice.

Instant Download

Your files will be available to download once payment is confirmed.  Here's how.

Instant download items don’t accept returns, exchanges or cancellations. Please contact the seller about any problems with your order.

Etsy Purchase Protection
Shop confidently on Etsy knowing if something goes wrong with an order, we've got your back for all eligible purchases — see program terms

Be the first to review this item

No reviews yet. See what customers say about other items from this shop.

You may also like

Shoppers with similar taste loved these

Show more
Show more
Listed on Nov 15, 2026