Daily Production Report Template | Shift Report with Downtime Reason, Scrap Qty and Attainment, Excel & Google Sheets, Printable PDF
Price:$4.99
Star Seller
Star Sellers have an outstanding track record for providing a great customer experience—they consistently earned 5-star reviews, shipped orders on time, and replied quickly to any messages they received.
5.0 out of 5
2 ratings
You can only make an offer when buying a single item
Star Seller. This seller consistently earned 5-star reviews, shipped on time, and replied quickly to any messages they received.
Highlights
This is one daily production report template.
WHAT YOU DOWNLOAD (one ZIP: Daily_Production_Report_Etsy_Bundle_v3.zip, 4 files)
* Daily_Production_Report_Template_v3.xlsx - the editable Excel workbook, 3 tabs. Shift Report: a header block (Date, Shift, Line, Supervisor and Department) above one row per part, 9 columns from left to right (Part, Planned Qty, Good Qty, Scrap Qty, Attainment, Downtime (min), Downtime Reason, Notes and Row Check), 8 example rows in gray italic text and room for 50 rows. You type the header fields and each row; the shaded Attainment and Row Check columns calculate. Attainment shows Good Qty divided by Planned Qty as a percent, and it stays blank until both are typed. A Planned Qty of zero leaves it empty too. Row Check stays blank on an empty row. Otherwise it names the first problem in red (Missing part, Negative number, Missing planned qty, Missing good qty, Missing downtime reason or Missing downtime min) or reads Complete in green. Missing downtime reason means minutes were typed with no reason; Missing downtime min means a reason was picked with no minutes. Scrap Qty, Downtime (min), Downtime Reason and Notes may stay blank. Supervisor takes a role, not a person's name, and Part takes a part number. Department (Production, Quality, Maintenance, Warehouse, EHS or Engineering) takes a value from its list, Planned Qty, Good Qty, Scrap Qty and Downtime (min) take a whole number of 0 or more, and Date takes a date you type; each of these refuses a wrong entry. Downtime Reason offers the reasons on the Lists tab and warns on any other entry, but a reason not on the list can still be typed. Shift and Line are free text. The grid header row carries filter buttons, and the header rows and the Part column stay frozen. Lists: your downtime reasons for the Downtime Reason dropdown, room for 10, shipped with 6 example reasons (Planned maintenance, Changeover, Machine breakdown, Material shortage, Tooling issue and Quality hold). Dashboard: the line and the shift at the top, a shift summary (parts on the report, attainment, downtime (min), rows with downtime, rows complete and rows to check), a units table (Planned Qty, Good Qty and Scrap Qty), parts at or above plan and below plan, downtime minutes by reason (each reason on the Lists tab, plus Not on the list or blank), and two charts (Downtime minutes by reason, and Planned, good and scrap units). The shift attainment divides the Good Qty total by the Planned Qty total.
* Daily_Production_Report_Template_v3_GoogleSheets.xlsx - the same three tabs with a Google Sheets Setup tab first.
* Daily_Production_Report_Print_Ready_v3.pdf - a blank one-page printable shift report with a header block (Date, Shift, Line, Supervisor and Department), 12 part lines to fill in by hand, 7 columns (Part, Planned Qty, Good Qty, Scrap Qty, Downtime (min), Downtime Reason and Notes) and a Shift totals line under Planned Qty, Good Qty, Scrap Qty and Downtime (min). US Letter landscape. No example entries, dropdowns, calculations, charts, Attainment or Row Check column.
* Daily_Production_Report_Start_Here_v3.pdf - one-page setup guide, prints on US Letter.
Instant digital download. No physical item ships.
At the end of a shift, the same questions come up: how many good parts each job made against its plan, how much was scrapped, and where the downtime minutes went. When those answers sit on a whiteboard or in loose notes, they are hard to pull together later. This report puts each part on one row with its planned, good and scrap quantities, its downtime minutes and the reason. Row Check names the first missing field, and one Dashboard totals the shift by units, parts at or above plan and downtime reason.
WHO IT IS FOR
Shift supervisors, production leads, quality and maintenance staff and small manufacturers who write down each shift's parts, scrap and downtime and want one plain record of the shift. The Supervisor field is recorded by role, never by name.
HOW IT WORKS
* Read the one-page Start Here, then open the Lists tab and replace the example downtime reasons with the reasons your site uses; the Downtime Reason dropdown reads this list.
* On the Shift Report tab, fill the header block: date, shift, line, supervisor (a role) and department.
* Overwrite the eight example rows with your own parts, or delete them. Type one row per part: part, planned qty, good qty and scrap qty. Attainment calculates once planned qty and good qty are typed.
* Type any downtime minutes and pick a reason on the same row. Row Check calculates as you type.
* Check the Dashboard: the shift summary, the units table and downtime minutes by reason. Working on paper? Print the blank shift report, then type it into the workbook.
MAKE IT YOURS
Add your company name to the page footer on each tab; the Start Here shows the Excel path. Downtime reasons change on the Lists tab, up to 10. To change a number rule, select that column, then Data, then Data Validation; the Department list sits on the Department cell in the header block.
HOW THIS WAS MADE
Designed and built by us. We use AI tools to help draft text and, on some products, artwork. Every template, formula and page is reviewed, edited and tested before it ships.
LICENSE
Single-organization internal use is included.
You may customize the files for your organization's internal business use. Do not resell, redistribute, share, sublicense, or repackage the source files.
Consultants who want to use the materials across multiple client organizations should message the shop about licensing options.
PLEASE NOTE
Record and reporting form only. Your own team sets the plan and the reasons. The example rows are fictional, and your own team sets the plan, the downtime reasons and any targets; adapt the template to your site. Row Check reads only whether a row's required fields are filled in, whether a number is negative, and whether downtime minutes and a downtime reason are entered together; it does not check the quantities against the plan. Nothing in it uses today's date: the date is one you type. It has no macros and does not connect to other systems. It is an operational support tool, not professional advice.
Instant Download
Your files will be available to download once payment is confirmed. Here's how.
Instant download items don’t accept returns, exchanges or cancellations. Please contact the seller about any problems with your order.
Etsy Purchase Protection
Shop confidently on Etsy knowing if something goes wrong with an order, we've got your back for all eligible purchases —
see program terms
Be the first to review this item
Speedy replies Has a history of replying to messages quickly.
Rave reviews Average review rating is 4.8 or higher.
More from this shop
Visit shop-
Digital download
Manufacturing SOP Template | Production Process Standard Operating Procedure with Quality Checkpoints | Editable Word & Printable PDF
$4.99
-
Digital download
Training Sign In Sheet | Employee Training Roster & Attendance Record | Trainer Sign Off | 6 Colors | Word Template and Printable PDF
$3.49
-
Digital download
5 Whys Template, Root Cause Analysis Worksheet in Word and Excel
$4.99
-
Digital download
RMA Form Template | Return Material Authorization Log with Return Reason, Disposition and Row Check, Excel & Google Sheets, Printable PDF
$4.99