Precio:MX$665.11

Cargando
IVA incluido

Value Stream Mapping Excel Template | VSM Template with Takt Time Calculator | Lean Manufacturing Process Mapping | Google Sheets

Incluye protección de compras de Etsy

Solo puedes hacer una oferta por compras de un único artículo

Puntos destacables

  • Diseñado por OperationalPlaybook
  • Decoración para fiestas para reuniones y celebraciones
  • Descarga digital
  • Tipos de archivos digitales: 1 PDF, 1 ZIP
  • El texto de esta descarga podría estar en otro idioma
Lo sentimos, no hemos podido traducir este anuncio al español.

Your kaizen events keep firing. Your lead time barely moves.

You optimized a station — and the bottleneck moved upstream. WIP between stations grew while everyone "got faster." Your team feels like they're working harder for the same lead time. Production schedules still don't match what the floor can run.

You don't have a station problem. You have a stream problem.

Most lean transformations stall because teams skip Value Stream Mapping and jump straight to kaizen events. They optimize their favorite station, the bottleneck moves, and lead time barely moves with it. Without a door-to-door view of the value stream, every kaizen is a guess.

This is the door-to-door view. Excel workbook with formulas. Google Sheets variant. PowerPoint training deck. 1-page cheat sheet. 15-page rollout guide. Pre-populated sample data on every tab. Built for manufacturing managers, CI leads, and plant managers who want to map their stream and commit to a real future state — not draw a pretty picture and forget it.

WHAT YOU GET — DOWNLOAD INSTANTLY

★ Excel Workbook (8 tabs): Process Inventory · Current State Map · Future State Map · Waste Log (the 8 wastes — TIMWOODS) · Improvement Backlog · Takt vs Cycle Time (with bottleneck visualizer chart) · Dashboard (with current vs future bar chart). Pre-populated with 8 sample process steps from a real packaging-line example. Department dropdowns built in (Production, Quality, Maintenance, Warehouse, EHS, Engineering). Lead Time Ladder, Takt Time Calculator, %VA, and waste counts all auto-calculate.

★ Google Sheets Variant: Same workbook, Sheets-compatible. Round-tripped formulas tested.

★ 20-Slide Training Deck (PowerPoint): Why VSM · The 8 Wastes · Door-to-door scope · Walking the floor · Drawing the current state · Takt time math · Future state design rules (the 5 rules in order) · Kaizen bursts · Implementation roadmap · 30/60/90 day cadence · Quiz · Closing.

★ 15-Page Implementation Guide (PDF): Pre-work checklist · Stakeholder map · 2-day mapping session run-of-show (hour by hour) · Future state design rules · Kaizen burst prioritization (the scoring matrix and the 3-5 cap) · Day 1 / Week 1 / Month 1 / Day 90 cadence · Worked example end-to-end · VSM symbol library · FAQ.

★ 1-Page Desk Cheat Sheet (Word): Symbol legend (11 symbols) · Takt time formula · The 8 wastes (TIMWOODS) with manufacturing examples · Kaizen burst decision tree. Print it. Laminate it. Post it at the gemba.

WHO THIS IS FOR

★ Plant Managers committing the resources for a lean transformation and need a system that holds the gain.
★ Continuous Improvement Leads facilitating their first or fifth VSM session and want a proven run-of-show.
★ Production / Value Stream Managers who own the future state delivery after the map is drawn.
★ Quality / Engineering / Maintenance Managers owning cross-functional kaizen bursts.
★ Operations Directors sponsoring multi-stream rollout across plants.

If your lean program has fired three kaizen events this quarter and the lead time chart hasn't moved, this system is for you.

HOW IT WORKS

1. SCOPE — Pick ONE product family. Door-to-door. Receiving dock to shipping dock.
2. WALK — Cycle time, changeover, uptime, batch size, operators per station. Count WIP between every station. Customer demand. Available time.
3. MAP — Draft the current state. Lead time ladder calculates automatically. Takt time emerges from the math.
4. DESIGN — Apply the 5 future state rules in order: produce to takt → continuous flow → supermarket pull → pacemaker → level the load. Place kaizen bursts.
5. ACT — Cap at 3-5 bursts. Owners. Target dates. Lead time impact. Run weekly Tier 2 review off the Improvement Backlog tab. Re-walk at day 90.

4 weeks to a working VSM. 90 days to measured lead time reduction.

WHITE-LABEL READY

Every reference in every file reads [Your Company Name]. Drop in your facility identity, swap the brand colors if your plant has its own, and use internally without attribution. Editable Excel, Word, PowerPoint — change a logo, change a footer, ship it. The system is yours to roll out under your own brand.

WHY THIS SYSTEM BEATS A SINGLE TEMPLATE

A 22-step Excel grid is not a system. A current-state-only template is not a system.

This is the complete kit:
★ Both maps (current AND future state — most VSM templates ship one).
★ The training deck (so you can walk your team through what the map means).
★ The Implementation Guide (so the rollout doesn't die at day 30).
★ The cheat sheet (so the operators on the floor have the same vocabulary as the leadership in the conference room).
★ The math (takt time, lead time ladder, %VA, bottleneck visualizer — auto-calculated, not hand-keyed).

The grid is free. The system isn't.

SUPPORT, REFUND, AND USE TERMS

★ Instant digital download — all files arrive immediately after purchase.
★ Fully editable — Excel, Word, PowerPoint, PDF.
★ Use internally without attribution. Not for resale or redistribution.
★ Questions? Message the shop — we respond within 1 business day.
★ If something doesn't work as described, message us first. We make it right. Digital products are not refundable in the standard Etsy sense, but we will replace, repair, or refund any file that doesn't perform as described.

READY TO MAP THE STREAM?

Click "Add to cart" — receive all files instantly — start your first VSM this week.

Pair this with the floor-level execution layer.

The 5S Workplace Organization System (in this same shop) is the ground game underneath every future-state map. VSM tells you where the lead time is hiding. 5S keeps the gain in place at the station level once the kaizen burst is done. The map without 5S is a drawing. 5S without the map is housekeeping. Together they hold the lead-time reduction.

Looking for a lower-cost meeting-discipline starter to run your weekly Tier 2 reviews off the Improvement Backlog tab? The Tier 1 Meeting Starter Kit (in this same shop) is the front-door companion, daily huddle structure and SQDIP board basics.

Descarga inmediata

Los archivos estarán disponibles para descargar una vez que se confirme el pago.  Sigue estas instrucciones.

No se admiten cambios, devoluciones ni cancelaciones de los artículos de descarga inmediata. Ponte en contacto con el vendedor si tienes algún problema con tu pedido.

Protección de compras de Etsy
Compra con confianza en Etsy sabiendo que estamos a tu lado si surge un problema con un pedido que reúne los requisitos. Consulta las condiciones del programa

También podría interesarte

A los compradores con gustos similares les han gustado estos artículos

Mostrar más
Mostrar más
Fecha de publicación: 22 jun 2026