Report this item to Etsy

OEE Calculator Excel Template | Overall Equipment Effectiveness, Six Big Losses Pareto, TEEP, Shift Log Dashboard | Lean Manufacturing Tool

Price:$16.99

Loading
4.5 out of 5 stars

4.5 out of 5

2 ratings

5 stars
50%
4 stars
50%
3 stars
0%
2 stars
0%
1 star
0%

You can only make an offer when buying a single item

Highlights

  • Designed by ShopFloorOps
  • Digital download
  • Digital file type(s): 1 File

Stop guessing your line's OEE. Calculate it — correctly — every shift.

QA-F-300 is a practitioner-built Overall Equipment Effectiveness calculator. Log a shift, and it returns Availability, Performance, Quality, OEE and TEEP automatically — then attributes every lost minute to the Six Big Losses on a true Pareto. No macros, no add-ins, no learning curve.

What makes it different
This isn't a one-screen calculator. It's a shift-by-shift log that rolls up into a real dashboard, and it ships with 25 fully-worked shifts of data so you can see every formula running before you touch your own numbers.

What you get (one workbook, five tabs):


Settings — editable Lines/Assets and Shifts pick-lists that drive the log dropdowns, plus a Six Big Losses reason-code reference and world-class benchmarks.
Shift Log — enter ten inputs per shift (times in minutes, counts in pieces, ideal cycle time in sec/pc). The calc block returns Planned Production Time, Run Time, Net Run Time, Good Count, Availability, Performance, Quality, OEE and TEEP — with benchmark colors on every shift.
Dashboard — period OEE aggregated the correct way (totals before ratios, not an average of percentages), a Six Big Losses Pareto with cumulative line, and an OEE trend chart. All update automatically.
Worked Example — 25 shifts on line PRESS-12, day and night, with breakdowns, changeovers and reject spikes built in.
Instructions — the formula, the Six Big Losses mapping, world-class bands, and how to read every number.


The Six Big Losses, in one common unit (minutes):
Breakdowns · Setup & Adjustments · Idling & Minor Stops · Reduced Speed · Startup Rejects · Production Rejects. The Pareto ranks them biggest-first so you know exactly where the recoverable runtime is.

World-class benchmarks built in: Availability ≥ 90% · Performance ≥ 95% · Quality ≥ 99.9% · OEE ≥ 85%. Cells flag green at world-class, red below floor.

Plus TEEP — Total Effective Equipment Performance — to expose schedule loss: the capacity you own but never put on the schedule.

Who it's for: Manufacturing & process engineers, production supervisors, CI/Lean teams, and plant managers reporting OEE & TEEP to leadership.

Format: One .xlsx workbook. Excel 2016 or later / Microsoft 365. Zero macros. Instant digital download — yours to reuse across every line and asset.

Note: digital product, no physical item shipped. For internal operational use.

Instant Download

Your files will be available to download once payment is confirmed.  Here's how.

Instant download items don’t accept returns, exchanges or cancellations. Please contact the seller about any problems with your order.

Etsy Purchase Protection
Shop confidently on Etsy knowing if something goes wrong with an order, we've got your back for all eligible purchases — see program terms

You may also like

Shoppers with similar taste loved these

Show more
Show more
Listed on Oct 24, 2026