Price:CA$18.65

Loading

Carpentry Code Quick Reference Guide — IRC/IBC 2021 Edition

Includes Etsy Purchase Protection

You can only make an offer when buying a single item.

Highlights

  • Designed by TradesmanOffice
  • Party decor for gatherings and celebrations
  • Digital download
  • Digital file type(s): 1 PDF

All the framing and finish code essentials in one easy-to-read guide. This printable quick reference covers floor joist spans, ceiling joist spans, rafter spans, header sizing for openings, the nailing schedule, stair requirements, and a common code violations checklist — all based on the 2021 International Residential and Building Codes.
Made for carpenters, framers, apprentices, and general contractors who need fast answers on the job site. No more flipping through the full code book — just the stuff you actually use every day, laid out clean and ready to print or keep on your phone.

Carpentry Code Reference
IRC IBC 2021 Cheat Sheet
Framing Quick Reference Guide
Floor Joist Span Chart
Rafter Span Table
Nailing Schedule Reference
Stair Code Requirements
Header Sizing Chart
Carpenter Apprentice Study Aid
Building Code Printable
Framing Code Violations Checklist
Contractor Field Guide
Carpentry Exam Study Guide

Instant Download

Your files will be available to download once payment is confirmed.  Here's how.

Instant download items don’t accept returns, exchanges or cancellations. Please contact the seller about any problems with your order.

Etsy Purchase Protection
Shop confidently on Etsy knowing if something goes wrong with an order, we've got your back for all eligible purchases — see programme terms